Friday, December 18, 2009

Thursday, December 10, 2009

Day 111: Dec 10th - Hired Captain to sail boat to Messina

It is so beautiful here that we are going to travel the island and explore. We'll pick up the boat in Messina in three days.

Wednesday, December 9, 2009

Day 110: Dec 9, 2009 - Trapani, Sicily to Trappeto

Sailed from 6am to 2:25pm, and covered 48 miles to the small town of Trappeto. Popular vacation spot with great beaches. From that moment onwards, a wonderful revival caused a rupture with the past thanks to the same residents of Trappeto who were inspired by a renewed faith and an inexhaustible need for humanization and justice towards a destiny of inexorable progress. Trappeto is nowadays a destination chosen by a great number of tourists for its numerous beach hotels, bed and breakfasts, restaurants, pizza places but above all for its sandy beaches. http://en.wikipedia.org/wiki/Trappeto

High of 63 and low of 51 degrees - sunny - wind N at 17 mph

Tuesday, December 8, 2009

Day 109: Dec 8, 2009 - Caglari to Trapani, Sicily

Sailed approx. 100 miles over 20 hours from Caglari to Trapani, Sicily. http://en.wikipedia.org/wiki/Sicily

The weather today was sunny high of 57 and low of 46 degrees wind 9 mph SW

Monday, December 7, 2009

Day 108: Two day sail to Cagliari, Sardinia

Sailed 100 miles down the coast of Sardinia. http://maps.google.com/maps?hl=en&tab=wl

Saturday, December 5, 2009

Day 106: Dec 5, 2009 - Porto Vecchio to Olbia, Sardinia

Sailed approx 50 miles to Olbia. The Costa Smeralda is beautiful http://en.wikipedia.org/wiki/Costa_Smeralda

Weather is a very nice 72 degrees

References

1. ^ "Guide to Olbia, Costa Smeralda, Badesi" (web). CharmingSardinia.com. January 2009. http://www.charmingsardinia.com/booksardegna/SARDINIA-Olbia-Costa%20Smeralda-Badesi.pdf.

Friday, December 4, 2009

Day 105: Pisa to Corsica

We sailed for 5 hours to the Porto Vecchio in Corsica. www.portovecchiocorsica.com for info - weather is chilly - highs of 60 and lows of 44

Day 100: Nov 29, 2009 - Valencia to Pisa, Italy

Sailed 900 miles, averaging 30 miles a day. Spending a week in Northern Italy

Day 60: Oct 30, 2009 - 10 day sail down the coast to Gibraltor

Sailed about 300 miles from Lisbon to Gibraltor, making 30 miles a day on average.

Day 53: Oct 23, 2009 - Arrive in Lisbon

Sailed for 10 days to Lisbon. Now we'll spend a week touring Portugal while some minor repairs and restocking is made to the boat.

Tuesday, October 13, 2009

Day 43: Oct 13 - log of sail in Azores

Sailed the Azores for 6 days and saw the delivery crew off for Portugal yesterday. It should take them 10 days to sail to Lisbon.

Weather has been beautiful - lows of 67 degrees and highs of 74 degrees and sunny with nice breezes of 7 to 14 knots.

Thursday, October 1, 2009

Day 36: Oct 6th - landfall sighting

11:52 hours and delivery team just reported sighting Corvo. http://www.destinazores.com/en/index.php?region_id=10

We will be flying there tomorrow to sail with the delivery team for 3 days and explore the Azore Archipelago.

Day 31: Oct 1st - 11 days into Atlantic crossing

Steady sailing, 5 to 10 foot swells, and cold at night with lows dipping into the low 30s.

Monday, September 21, 2009

Day 19 to 21: Sept 21st Crossing the Atlantic

Met with delivery crew and finished provisioning for 14 to 21 day sail across Atlantic from Halifax to Azores. Crew reported that they sailed to Halifax the first day and purchased an extra jib sail and topped off water. Weather reports have been sunny and pleasant last three days, lows of 49 and highs of 72 degrees. Steady and sustained winds between 5 and 15 knots with gusts to 20 knots. Seas relatively calm at 1 meter, building to 5 meters as wind persists and we get further out to sea.

Friday, September 18, 2009

Day 18: Sept 18th - Provition the boat for sail across Atlantic

Preparing to sail to the Azores - the Distance is 3020 kilometers or 1876 miles or 1630 nautical miles. We expect is will take 14 to 21 days to make this crossing.

Thursday, September 17, 2009

Day 16 and 17: Sept 16th and Sept 17th Bar Harbor to West Isles, NB, Canada

Sailed 192 KM (119 miles) with stop overs in John's Port and Manchas Bay

Wednesday, September 16, 2009

Day 13, 14, and 15: Sept 13th to the 15th - Rest at Bar Harbor

Checked into the hotel on the 12th - having maintenance done on the bildge pump and the roller furler.

Day 12: Sept 12th - Camden, ME to Bar Harbor, ME

Sailed 40 miles in 6 and a half hours and finally arrived at Bar Harbor. Going to check into a hotel and stay a few days.

Day 10: Sept 10th - Portland, ME to Boothbay Harbor, ME

Low of 41 and high of 75 - big temperature changes - feels cold on the water - sailed 42 miles in winds avg 12 mph

Day 9: Sept 9th - Portsmouth, ME to Portland, ME

50 mile trip - winds avg 15 mph out of the east - fast sailing in rough seas - made 8 knots on avg - set sail at 5:40am and arrives at 12:35am

Day 7: Sept 7th - Marblehead, MA to Essex Bay, MA

Sailed around the point - rough seas - 22 miles in 5 hours

Day 6: Sept 6th - Hull, MA to Marblehead, MA

Spent Saturday in Boston. Set sail on Sunday - traveled 6 hours and 32 miles.

Friday, September 4, 2009

Day 5: Sept 4 - Sandwich to Hull Yacht Club, Hull, MA

Sunrise: 0612
Set Sail: 0515
Wind: WSW 2 to 8 knots, building during the day
Conditions:LO 54 / HI 67

Traveled 51.2 miles, motored in the morning, felt chilly out on the water but had steady sun. Made an average of 5 knots and arrived at 3:30. Went to dinner in Boston at the home of friends.

Detailed conditions:
barnstable ma-
including the beaches of...chatham...eastham...provincetown
353 am edt fri sep 4 2009

.today...
east coast ocean rip current risk.....low.
east coast ocean surf.....1 to 2 feet.
swell...............east swell around 2 feet.
period..............8 seconds.
east coast ocean water....64 degrees.
sky/weather.........partly sunny.
max temperature.....around 72.
beach winds.........northeast winds around 10 mph.
uvi index...........7 - high.
lightning threat....no lightning expected.

a low risk of rip currents implies that wind and wave conditions are
not expected to support the development of enhanced rip currents.
however...rip currents are always possible...especially near jetties
and other structures.

.tonight...mostly clear. lows in the lower 60s. north winds around
7 mph.
.saturday...sunny. highs in the lower 70s. northeast winds around
9 mph.
.saturday night...mostly clear. lows around 60. east winds around
6 mph.

tide information...

at nauset beach...

low tide at 4:58 am
high tide at 11:07 am
low tide at 5:11 pm
high tide at 11:20 pm

at hyannisport...

high tide at 12:32 am
low tide at 6:12 am
high tide at 12:57 pm
low tide at 6:25 pm

Thursday, September 3, 2009

Day 4: Sept 3: Newport to Sandwich Marina, end of Cape Cod Canal

Sunrise: 0618
Set Sail: 0602
Wind: SSW 3 to 5 mph
Conditions: Clear and Sunny, low 59 high 77 degrees

Sailed 48 miles in about 8 hours. Great day! Not much around the Sandwich Marina. Hung out on the boat.

Day 3: Sept 2 - Mystic to Newport Yacht Club

Sunrise: 0616
Set Sail: 0540
Wind: ESE 5 to 10 knots
Conditions: Partly cloudy low 61 degrees

Sailed 41 miles in about 7 hours. Great town, lots for sailors to do.

Tuesday, September 1, 2009

September 1, 2009 - New Haven Harbor to Mystic

Sunrise:6:18am
Set Sail: 7:07am
Wind: NE WINDS 10 TO 15 KT. SEAS 1 TO 2 FT.
Temp: 49 degrees, feels like 46 degrees

Beautiful sail today. We made the 57 miles with the tides to our favor in just over 7 hours, and arrived at 2:30 in time to go to Mystic Pizza for a snack. We walked around the lovely town and met Judy and Jeff (Last Name?) for dinner. Very nice weather today, lots of sun and a high of 75 degrees. We moored at the Mystic River Yacht club for the evening.

Monday, August 31, 2009

Day 1: August 31, 2009 - Old Greenwich, CT to New Haven Yacht Club

Set sail: 0552
Sunrise: 0620
Mostly Cloudy
70
N at 10mph

Sailed under steady winds for 6:22 minutes and traveled 37.8 miles averaging 6.1 knots. Arrived at Oyster Point Marina in time for lunch.

Oyster Point MarinaAddress:‎
Removal requested ()Restore requestedEdited
Write a review - - more info »
Placement on map is approximate
98 S Water St
New Haven, CT 06519-2822

Get Directions
(203) 624-5895
* approximate times
- smharbor.com

Weather was great and we went for a swim at the beach. We met friends for dinner at the Meating Place Steak HouseAddress:
0" jsvalues=".innerHTML:m.addressLines[0]+' - ';"> - more info »
114 Cove St
East Haven, CT 06512
(203) 467-1313



Note that The total length of the worlds coastline is in the region of 217,490 miles. If we were to sail the coastline of the world averaging 40 miles per day it would take almost 15 years to complete the journey.

Our plan is to sail up the coast to Prince Edward Island and then see about having someone sail our boat to Ireland. From there we could sail along the coast to a destination yet to be determined.